The work to be performed by the Successful Qualified Firm under this OPS will consist of construction management services for Project 1, consistent of three design sections of the Program. Project 1 generally comprises of the following work: Section 1 - The replacement of the HEW and HWE roadways and the Interchange 14 ramp system between Mileposts N0.0 and N1.3, inclusive of Structure Nos. N0.16A, N0.28A, N0.28C, N0.28D, N0.75, 104.74A, 104.82B and N2.01W up to approximately Pier W30. This work will also include the demolition of the existing bridges; Section 2 - The replacement of the Newark Bay Bridge over Newark Bay, specifically Structure Nos. N2.01W, N2.01, and N2.01E with staged twin cable-stayed bridges to accommodate four travel lanes and standard full left and right shoulders in each direction across the Newark Bay from approximately Milepost N1.3 to N2.9. This work will also include the demolition of the existing bridges including the continuous tied arch through truss over the navigable channel of Newark Bay; and Section 3 - The replacement of the HEW and HWE roadways, Interchange 14A ramp systems and associated structures from Mileposts N2.9 to N4.1, inclusive of Structure Nos. N3.00, N3.24, N3.39, N3.53B, N3.53D and N3.73. This work will also include the demolition of the existing bridges.