Firelines Utility Location Investigation 1 L.S. Trench & Backfill 1,210 L.F. 8" Directional Boring 1,230 L.F. 8" DR 18 PVC Waterline, incl fittings 1,190 L.F. 8" DR11 HDPE Waterline, incl fittings 1,270 L.F. 8" Gate Valve w/ Can 6 Ea. 6" Gate Valve w/ Can 4 Ea. Firehydrant 4 Ea. Connect to Exist Fireline 3 Ea. Connect to Exist Potable W/L at Kitchen 1 L.S. Asphalt Pavement Cuts & Permanent Repairs 115 S.Y. Concrete Pavement Cuts & Permanent Repairs 10 S.Y. Concrete Curb Replacement 50 L.F. Sidewalk Replacement 20 S.Y. Bermuda Grass Solid Slab Sod 12,000 S.F. Fireline Total Bid Price Potable Waterlines Utility Location Investigation 1 L.S. Trench & Backfill 670 L.F. 6" Directional Boring 320 L.F. 2" Directional Boring 400 L.F. 4" DR 18 PVC Waterline, incl fittings 530 L.F. 6" DR11 HDPE Waterline, incl fittings 400 L.F. 2" PE Tubing, incl fittings 515 L.F. 4" Gate Valve w/ Can 1 Ea. 2" Gate Valve w/ Can 3 Ea. Connect to Exist Waterline 7 Ea