A. Mobilization/Demobilization, General Requirements, and Bonds and Insurance. B. Environmental Protection and Maintenance of Traffic. C. Remove and deliver to the Owner salvageable equipment and materials as indicated on the Drawings and as requested by the Owner, remove and protect equipment to be relocated as indicated on the Drawings, remove and dispose of equipment and materials such as concrete slabs and other items indicated on the Drawings, and decommission the existing wet well and piping to be abandoned in accordance with the Contract Documents. D. Temporary Bypass Pumping System. E. Lift Station #20 Upgrades, which includes site civil work, fencing, saddle manhole, wet well, sanitary sewer piping, submersible pumps, potable water service, discharge piping, valves, instrumentation equipment, electrical and control components, relocation of emergency generator and transfer switch, concrete pads, and driveway. F. Conduct all necessary testing and start-up. G. Prepare Record Drawings.