(Contractor must obtain and submit all permits prior to performing any work). Removal and installation services for the existing exterior light fixtures at the Dennis C. Moss Cultural Arts Center. The Project includes, but is not limited to the following activities: 1. Removal and replacement of all existing light fixtures with new LED fixtures. Refer to enclosed documentation for new fixtures specified by the architect. 2. Add new light fixtures and required support equipment/drivers as needed to provide new light on each glass panel. Total of thirty-six (36) new light fixtures. 3. Apply new plaster finish to two (2) low concrete walls, where light fixture and glass signage are embedded, following the architect’s drawings and specifications. 4. Coordinate all work with the Department of Cultural Affairs (owner) and the Dennis C. Moss Cultural Arts Center staff to minimize disruptions 5. Contractor to protect existing glass railing to remain. 6. Full set of drawings included in the solicitation package. 7. Permitting fees to be included in Project costs.