1. Remove and replace approximately 21,000 square feet of built-up roofing. 2. Contractor is responsible for any and all field measurements required to perform the Scope of Work (SOW) herein attached. 3. Contractor will make reference to the asbestos report dated October 20, 2023 (Project #: Project # 20-21102) as part of this SOW and ultimately a condition of the contract with MDFR and permit with the Authority Having Jurisdiction (AHJ). 4. The Contractor is responsible for all cost associated in the performance of the SOW; to include but not limited to labor, materials, equipment, transportation, permitting, insurances, and related engineering required to complete the work and obtain a final inspection with the Authority Having Jurisdiction (AHJ). No provision will be made for price escalation. 5. Contractor to verify slope of deck before tear off of existing roof. Contractor will ensure that new system applied will provide positive drainage to floor drains, thru-the-walls and/or over-flows. 6. Contractor to remove and properly dispose of the existing roofing system and any debris produced in the completion of this contract. 7. Contractor to install new EverGaurd Extreme TPO 60 mil roofing system (see attachment 1) and replace store front (see attachment 2).