The Contractor must provide all adequate and competent labor, equipment, tools, and materials necessary to remove/replace existing structure(s) to restore area drainage by installing/replacing drain pipe, patching, concrete drive, and sod as specified along Albert Thompson Rd (R02H002); Folsom, Louisiana. The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law. Contractor shall provide all signage and barricades. The time period for completion of the project is forty-five (45) calendar days from the issuance of the Notice to Proceed (NTP) issued by the Parish. Any work that may be reasonably inferred from the specifications or drawings as being required to produce the intended result shall be supplied whether or not it is specifically called for. Work, materials or equipment described herein which so applied to this project are covered by a wellknown technical meaning or specification shall be deemed to be governed by such recognized standards unless specifically excluded.