1. The Work to be performed by the Contractor includes furnishing all materials, labor, tools, equipment, water, light, power, transportation, superintendence, temporary construction of every nature, mobilization, maintenance of traffic and all other services, facilities and other related construction items of every nature whatsoever necessary to modify, construct, complete, deliver and place in operation the subject Work at the various sites as described on the “Schedule of Values” and “Roadways to be Resurfaced” lists and/or as shown on the “Project Locations Map(s)” and/or as herein described/specified. All Work shall be in accordance with the Contract Documents, City of Belle Glade Ordinances and regulations, Florida Statutes, and the Florida Department of Transportation (“FDOT”) Standard Specifications for Road and Bridge Construction, latest edition, the FDOT Design Standards, latest edition and any other applicable FDOT specifications (herein, collectively, the “FDOT Specifications”). 2. The roadways are to be resurfaced per the methods and specifications listed below, in accordance with applicable construction guidelines/FDOT Specifications and as described on the “Schedule of Values,” “Roadways to be Resurfaced,” “Project Locations Map(s)” and “Roadway Typical Section.”