Hot-Mix Asphalt Surface Removal, 2" (14,000sy), Bituminous Materials (Tack Coat) (6,304lb), Hot-Mix Asphalt Binder Course, IL4.75 (618ton), Hot-Mix Asphalt Surface Course, Mix "D", N50 (1,236ton), Class D Patching (700sy), Structure Adjustment (12ea), Fiber-Modified Asphalt Crack Sealing (16,000ft), Pavement Rejuvenation (16,100sy), Sidewalk Removal (1,280sf), Portland Cement Concrete Sidewalk, 5" (1,002sf), Detectable Warnings (200sf), Curb & Gutter Removal & Replacement (315ft), Thermoplastic Pavement Marking Line, 4" (3,300ft), Thermoplastic Pavement Marking Line, 6" (1,060ft), Thermoplastic Pavement Marking Line, 12" (10ft), Thermoplastic Pavement Marking Line, 24" (108ft), Thermoplastic Pavement Marking, Letters & Symbols (62sf), Traffic Control & Protection, Standard 701501 (1lsum), Traffic Control & Protection, Standard 701801 (1lsum), Preparation of Base, 4" (9,350sy), Bituminous Materials (Prime MC 30) (4,095gal), Seal Coat Aggregate (145ton), Bituminous Materials (Prime HFE 150) (6,450gal), Cover Coat Aggregate (150ton), Fog Seal (9,350sy)