Cobbtown – Construction will consist of 6” X 3’ V-Gutter, 4”/6” x 5’ Sidewalk, and Driveway reconstruction. See details on the attached drawings. Grading Complete will include the removal of existing driveway pavement, removal of existing sidewalks, removal of existing pipes, and backfill of existing ditches. All utilities are to be located prior to beginning construction. Collins – Construction will consist of 4” x 5’ Sidewalk and drainage system to replace the existing ditch. See details on the attached drawings. Grading Complete will include any needed excavation or fill needed to add pipes and cover existing ditch. It will also include removal of existing sidewalk. Entire area is to be grassed. Silt fence to be placed around each ditch inlet and at the beginning and end of project at drainage inlets and area next to outfall ditch. All utilities are to be located prior to beginning construction.