This work shall conform to FRSA requirements, details, and provisions. This work shall include all equipment, materials, labor, transportation, and workmanship to install sanitary sewer as shown on the plans. This work shall be in accordance with the FRSA Standard Detail Sheet. Work includes all dewatering, mobilization, testing, site preparation, connection to existing manholes, bypass pumping, earth excavation, trench backfill and compaction, pipe bedding, temporary sewer main connections, temporary sewer main plugs, installing new sewer pipe (various sizes and types, as required) on grade and in line according to the plans and specifications. The work also includes grading and dust control, and all other materials, labor, supervision, transportation, services, and all else that is necessary for the completion of the work and not included elsewhere. Utility relocation shall be included in the work covered in this item unless specifically provided for elsewhere. Any permits required to perform dewatering work on this project shall be secured by the Contractor; it shall be his/her responsibility to provide any bonds, insurance’s, guarantees, etc., as required by said permit(s). Abandonment of dewatering facilities shall be performed in accordance with pertinent State and County requirements. All dewatering shall be incidental to sanitary sewer pipe and will not be paid for separately.