The primary project tasks include the following: a. Demolition & Preparation i. Remove and dispose of existing damaged fencing and associated paving debris as needed. ii. Fill and level voids in the paved surfaces as needed. b. Installation i. Install new fencing to replace damaged fencing throughout the campus as specified. ii. Install the specified fencing to match existing fencing exactly. iii. Repair damaged paved surfaces. iv. Provide all necessary repair, modification and replacement to return the paved surfaces and fencing to undamaged condition. c. Finishing & Compliance i. All replacement fencing must be an exact match to the existing fencing in height, style, composition and color. ii. Repairs to damaged paved surfaces must be returned to pre-hurricane damaged condition.