The work consists of removing and reconstructing the concrete curbs on both sides of the southbound bridge, installing new railing anchorage and resetting the existing 2-bar aluminum bridge rail, setup, take-down, and maintenance of all required traffic control devices, and all other work incidental thereto in accordance with the Plans and Specifications. The work also consists of removing pavement surface, select location removal of remaining pavement and waterproofing membrane, partial depth and full depth deck chipping and patching, deck membrane repair, paving, asphaltic plug joint removal and reinstallation, setup, take-down, and maintenance of all required traffic control devices for mainline and local road, and all other work incidental thereto in accordance with the Plans and Specifications.