This project will include, but is not limited to, demolishing, removing and replacing the wood structure and the shower facilities at this location and creating a rip-rap drainage swale for stormwater management. The new structure shall include hand rails/posts, composite decking, stringers, concrete work and bench seating. 1. MOBILIZATION 1 JOB L.S. $ 2. M.O.T. 1 JOB L.S. $ 3. CONSTRUCT NEW WALKOVER STRUCTURE WITH EVERGRAIN COMPOSITE DECKING PER ISIMINGER ENGINEERING PLANS 1 JOB L.S. $ 4. SIDEWALK DEMO & NEW SIDEWALK/RAMP PER SIMMONS & WHITE ENGINEERING PLANS 1 JOB L.S. $ 5. RIP/RAP DRAINAGE AREA/SWALE PER SIMMONS & WHITE ENGINEERING PLANS 1 JOB L.S. $ 6. SILT FENCING 1 JOB L.S. $ 7. BEACH COMPATIBLE FILL (SAND) 20 CY $ $ 8. SEAGRAPE TRIMMING 1 JOB L.S. $ 9. REMOVE & REPLACE SHOWER FACILITIES 1 JOB L.S. $