DEMO: 3) The contractor shall bid to demo the following: (wall/ceiling sheetrock, wall/ceiling insulation, interior trim, cabinets, duct pipe, and existing floor covering) of the interior of the apartment and to remove all debris and dispose of at an approved dump site. ELECTRIC: 4) The contractor shall bid to remove all switches, outlets and covers. 5) The contractor shall bid to install new ivory switches, outlets, ground fault outlets and covers 6) The contractor shall bid to remove existing light fixtures and install with new. (Match existing light fixtures and install new light bulbs) HAVC/WATER HEATER: 7) The contractor shall bid to remove Furnace, A-Coil and Duct system. Remove and replace furnace platform.