1. Remove, dispose and replace existing damaged concrete pavers as determined in the field by Owner 2. New replacement pavers shall be furnished by the Owner. Contractor is responsible for the loading and transportation of the Owner’s palletized pavers from 301 Green Hill Parkway to the jobsite. 3. Base Bid (As measured - one unit paver equals one square feet), is the installation of 1,200 (onethousand-two hundred) pavers or 1,200 square feet. 4. Contractor to furnish and install base and polymeric sand as needed to reset and lock new pavers. 5. Furnish a unit price, to remove and replace one additional paver- as per items 1-4 above. 6. Limits of work, stockpiling, staging and access shall be determined in the field. i. At the end of each workday, the sidewalk (new pavers and existing) will be of construction equipment, appurtenances, obstruction and be accessible. ii. Storage and stockpiling of materials (sand and pavers) shall be in containers or palletized. iii. Phase and coordinate daily work to accommodate and allow for pedestrian traffic. 1. A minimum of 50% of the bus shelter and frontage shall always remain usable/accessible. 2. Provide traffic management/signs to accommodate pedestrian traffic to and from the Worcester Common and City Hall. 7. Furnish, install, and maintain six-foot height panelized/mobile temporary constructions metal fence and hardware as required to protect and secure the daily limits of work and staging area. 8. Restore any lawn and hard-scape areas disturbed or damaged by the work. 9. The Work shall be substantially completed for occupancy by: i. Within 60 calendar days from Notice to Proceed and or By October 31, 2025, whichever is sooner.