VERDIGRIS RIVER WATER TREATMENT PLANT RAW WATER PUMP STATION IMPROVEMENTS: This project includes installation of up to two new vertical turbine pumps at the Raw Water Pump Station in the raw water intake building. Base Bid work includes installation of Raw Water Pump No. 4 and associated piping, valves, electrical equipment, and instrumentation and controls. Additive Alternate No. 1 work includes the installation of electrical gear and instrumentation and controls for Raw Water Pump No. 5. Additive Alternate No. 2 work includes the installation of Raw Water Pump No. 5 with associated piping and valves. The Verdigris River Water Treatment Plant is located at 6670 S. 361st Street in Broken Arrow, OK 74014. Construction time will be 606 calendar days.