Base Scope: 1. Grow House: • Build a new detached structure for the purpose of weed and insect growth, by a concrete sidewalk, on the East side of the existing building, constructed of wood studs with stucco finish and a roof constructed from wood trusses with standing seams and metal per roof drawings. o The building will consist of four rooms and a central hallway as shown on sheet A111. The room’s wall interior will be protected by full height FRP panels. Each room will contain a hose bib, trench drain, light fixture and mechanical system as shown on M101 sheet. A utility sink will be located in the central hallway • Relocate existing sprinkler line to outside of the proposed building footprint 2. Greenhouses: • Replace polycarbonate panels on the East greenhouse – panel amount to be determined during pre-bid walk through 3. ADA Upgrades: • Provide ADA opener at main entry door at existing building • Provide various ADA updates – to be confirmed following pre-bid site walk and via addendum to IFB Alternates: 1. Provide deduction for VE alternates listed on M101 & M601 sheets 2. Provide alternatue fees for polycarbonate replacement at existing West Greenhouse, per sheet A112 details 3. Provide alternate fees for LED light fixtures in both greenhouse, re: E101 & A112 for more details. Provide alternate fees for the suspended LED light fixtures in the grow house, re; E101 & A131 for details. Lighting shall be suspended from shelving as listed under Alternate #4. If shelving alternate #4 is not accepted, lighting will be suspended from ceiling. List the fee per each grow house room separately. 4. Provide alternate fees for pallet rack shelving in grow house in each room 101, 102,103 and 104, re: A111