MOBILIZATION 1.000 LS BONDS AND INSURANCE 1.000 LS REMOVAL & DISPOSAL OF EXISTING PAVEMENT 250.000 SY REMOVAL OF EXIST. GUARDRAIL 1,300.000 LF BORROW EXCAVATION 2,010.000 CY EXCAVATION FOR SHOULDER PAVING 601.392 STA HAULING OF EXCAVATED SHOULDER MATERIAL 601.392 STA MAINTENANCE STONE 270.250 TON HMA SHOULDER WIDENING COURSE 4,847.040 TON LIQUID ASPHALT BINDER PG64-22 2,445.254 TON FULL DEPTH ASPH. PAV. PATCHING 4" UNIF. 1,200.000 SY FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 15,825.000 SY MILLING EXISTING ASPHALT PAVEMENT 1.75" 129,951.000 SY MILLING EXISTING ASPHALT PAVEMENT 2.0" 202,130.000 SY MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 19,230.000 SY ASPHALT SURFACE COURSE TYPE B 28,810.647 TON ASPHALT SURFACE COURSE TYPE C 8,660.880 TON DRIVEWAY PAVING-SURFACE TYPE C 1,153.700 TON TRAFFIC CONTROL 1.000 LS PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 4,660.000 SF 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 57,760.000 LF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 178,694.000 LF 6" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 45,622.000 LF 8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 13,470.000 LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 4,628.000 LF WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 118.000 EA WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 40.000 EA WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 4.000 EA 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 55,960.000 LF 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 467,939.000 LF 6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 3,525.000 LF