MOBILIZATION 1.000 LS BONDS AND INSURANCE 1.000 LS REMOVAL OF EXIST. GUARDRAIL 1,075.000 LF BORROW EXCAVATION 9,643.000 CY EXCAVATION FOR SHOULDER PAVING 914.000 STA HAULING OF EXCAVATED SHOULDER MATERIAL 914.000 STA MAINTENANCE STONE 458.950 TON HMA SHOULDER WIDENING COURSE 4,735.281 TON LIQUID ASPHALT BINDER PG64-22 1,706.191 TON FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 10,950.000 SY FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 11,450.000 SY FULL DEPTH ASPH. PAV. PATCHING 10"UNIF 15,600.000 SY MILLING EXISTING ASPHALT PAVEMENT 1.75" 54,550.000 SY MILLING EXISTING ASPHALT PAVEMENT 2.0" 153,370.000 SY MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 10,094.000 SY ASPHALT SURFACE COURSE TYPE B 17,296.360 TON ASPHALT SURFACE COURSE TYPE C 7,512.300 TON DRIVEWAY PAVING-SURFACE TYPE B 321.564 TON DRIVEWAY PAVING-SURFACE TYPE C 431.250 TON TRAFFIC CONTROL 1.000 LS PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 3,956.000 SF 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 16,272.000 LF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 348,406.000 LF 6" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 420.000 LF 8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 3,018.000 LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 3,336.000 LF WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 48.000 EA WHITE LANE DROP ARROW (LEFT OR RIGHT)-FAST DRY PAINT 9.000 EA 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 17,517.000 LF 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 427,505.000 LF 6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 1,920.000 LF WHITE WORD MESSAGE "STOP AHEAD" -PERM.PVMT.MARKING 6.000 EA