MOBILIZATION 1.000 LS BONDS AND INSURANCE 1.000 LS CONSTRUCTION STAKES, LINES & GRADES 1.000 EA CPM PROGRESS SCHEDULE 1.000 LS CLEARING & GRUBBING WITHIN RIGHT OF WAY 2.200 ACRE REMOVAL & DISPOSAL OF EXISTING ASPHALT PAVEMENT 430.000 SY REMOVAL OF EXIST. GUARDRAIL 932.000 LF REMOVAL & DISPOSAL OF EXISTING BRIDGE 1.000 LS UNCLASSIFIED EXCAVATION 4,557.000 CY BORROW EXCAVATION 4,804.000 CY FINE GRADING 2,443.000 SY GRADED AGGREGATE BASE COURSE (6" UNIFORM) 150.000 SY MAINTENANCE STONE 100.000 TON PRIME COAT 41.000 GAL LIQUID ASPHALT BINDER PG64-22 72.000 TON FULL DEPTH ASPH. PAV. PATCHING 10"UNIF 244.000 SY MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 149.000 SY ASPHALT BASE COURSE - TYPE B 718.000 TON ASPHALT INTERMEDIATE COURSE TYPE B 88.000 TON ASPHALT INTERMEDIATE COURSE TYPE C 230.000 TON ASPHALT SURFACE COURSE TYPE C 284.000 TON ASPHALT SURFACE COURSE TYPE E 14.000 TON TRAFFIC CONTROL 1.000 LS BARRICADE - TYPE III 90.000 LF PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 190.000 SF PERMANENT CONSTRUCTION SIGNS (BARRICADE MOUNTED) 107.000 SF TYPE B - FLASHING LIGHT 16.000 EA 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 2,300.000 LF 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 2,300.000 LF PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 15.000 EA 6.0" SCHEDULE 40 PVC CONDUIT 8.000 LF 6.0" SCHEDULE 40 PVC CONDUIT - 90 DEGREE BEND 1.000 EA FURNISH & INSTALL 2.0" SCHEDULE 80 PVC CONDUIT 1,234.000 LF