MOBILIZATION 1.000 LS BONDS AND INSURANCE 1.000 LS REMOVAL & DISPOSAL OF EXISTING PAVEMENT 85.000 SY REMOVAL OF EXIST. GUARDRAIL 600.000 LF UNCLASSIFIED EXCAVATION 28.000 CY BORROW EXCAVATION 2,996.000 CY EXCAVATION FOR SHOULDER PAVING 896.600 STA HAULING OF EXCAVATED SHOULDER MATERIAL 896.600 STA MAINTENANCE STONE 69.000 TON HMA SHOULDER WIDENING COURSE 4,891.920 TON LIQUID ASPHALT BINDER PG64-22 2,240.619 TON FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 6,200.000 SY FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 700.000 SY MILLING EXISTING ASPHALT PAVEMENT 2.0" 83,775.000 SY MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 6,500.000 SY ASPHALT INTERMEDIATE COURSE TYPE B 8,377.600 TON ASPHALT SURFACE COURSE TYPE B 8,547.600 TON ASPHALT SURFACE COURSE TYPE C 15,410.933 TON DRIVEWAY PAVING-SURFACE TYPE C 1,629.000 TON TRAFFIC CONTROL 1.000 LS PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,688.000 SF 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 3,080.000 LF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 401,330.000 LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 1,860.000 LF 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 15,340.000 LF 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 348,600.000 LF 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 1,090.000 LF 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 146,805.000 LF 24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 670.000 LF 4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 5,770.000 LF 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 123,000.000 LF