MOBILIZATION 1.000 LS; BONDS AND INSURANCE 1.000 LS; BORROW EXCAVATION 3,516.000 CY; EXCAVATION FOR SHOULDER PAVING 352.704 STA; HAULING OF EXCAVATED SHOULDER MATERIAL 352.704 STA; MAINTENANCE STONE 120.000 TON; HMA SHOULDER WIDENING COURSE 1,763.520 TON; LIQUID ASPHALT BINDER PG64-22 1,560.103 TON; ARAMID FIBER 2,354.900 LB; FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 11,500.000 SY; FULL DEPTH ASPH. PAV. PATCHING 10"UNIF 500.000 SY; MILLING EXISTING ASPHALT PAVEMENT 2.0" 4,074.000 SY; MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 1,225.000 SY; ASPHALT SURFACE COURSE TYPE B 407.387 TON; ASPHALT SURFACE COURSE TYPE C 21,876.580 TON; ASPHALT SURFACE COURSE TYPE D 395.000 TON; DRIVEWAY PAVING-SURFACE TYPE D 701.875 TON...