MOBILIZATION 1.000 LS BONDS AND INSURANCE 1.000 LS RAILROAD INSURANCE AND FLAGGING CSX 1.000 LS REMOVAL & DISPOSAL OF EXISTING PAVEMENT 200.000 SY BORROW EXCAVATION 2,690.000 CY EXCAVATION FOR SHOULDER PAVING 1,379.136 STA HAULING OF EXCAVATED SHOULDER MATERIAL 1,379.136 STA MAINTENANCE STONE 92.650 TON HMA SHOULDER WIDENING COURSE 10,669.560 TON LIQUID ASPHALT BINDER PG64-22 2,155.397 TON ARAMID FIBER 3,245.000 LB FULL DEPTH ASPH. PAV. PATCHING 4" UNIF. 6,095.000 SY FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 3,170.000 SY MILLING EXISTING ASPHALT PAVEMENT 1.5" 11,900.000 SY MILLING EXISTING ASPHALT PAVEMENT 2.0" 99,610.000 SY MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 7,400.000 SY ASPHALT SURFACE COURSE TYPE B 10,854.480 TON ASPHALT SURFACE COURSE TYPE C 12,631.560 TON ASPHALT SURFACE COURSE TYPE D 2,509.520 TON DRIVEWAY PAVING-SURFACE TYPE D 1,015.625 TON TRAFFIC CONTROL 1.000 LS PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,648.000 SF 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 1,180.000 LF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 378,760.000 LF 8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 220.000 LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 1,570.000 LF WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 4.000 EA RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 2.000 EA 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 28,440.000 LF 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 191,960.000 LF 24" YELLOW DIAGONAL LINES - FAST DRY PAINT 400.000 LF