MOBILIZATION 1.000 LS; BONDS AND INSURANCE 1.000 LS; CONSTRUCTION STAKES, LINES & GRADES 1.000 EA; REMOVAL & DISPOSAL OF EXISTING PAVEMENT 990.000 SY; REMOVAL & DISPOSAL OF EXISTING CURB 800.000 LF; REMOVAL OF EXIST. GUARDRAIL 625.000 LF; UNCLASSIFIED EXCAVATION 760.000 CY; BORROW EXCAVATION 2,446.000 CY; EXCAVATION FOR SHOULDER PAVING 407.616 STA; HAULING OF EXCAVATED SHOULDER MATERIAL 407.616 STA; ADDITIONAL ROCK FOR FULL DEPTH RECLAMATION 2,250.000 TON; MAINTENANCE STONE 105.150 TON; CEMENT MODIFIED RECYCLED BASE (10" UNIF)-CURING METHOD B 115,100.000 SY; PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE 4,030.000 TON; HMA SHOULDER WIDENING COURSE 2,192.960 TON; LIQUID ASPHALT BINDER PG64-22 1,671.867 TON; ARAMID FIBER 3,405.000 LB...