The Contractor must provide the labor, tools, fuels, equipment, apparatus and supplies necessary to completely remove snow and ice, including the application of ice-melting salt/sand materials. 1. INSPECTION OF THE SITE(s) AND SUBMISSION OF STATEMENT- Before submitting the proposal, the bidder shall visit each site/facility/location within the area(s), examine its conditions, and thoroughly acquaint themselves with all obstacles and advantages of performing the work. 2. The entire sidewalk must be cleared of snow and ice to ensure safe and accessible passage for pedestrians. Partial clearing is not acceptable. Contractors are required to fully address the entire sidewalk area as directed by the Official, Project Manager, or their designee. 3. Work will include clearing snow from sidewalks, walkways, pathways. The vendors selected through this IFB will perform sucThe Contractor must provide the labor, tools, fuels, equipment, apparatus and supplies necessary to completely remove snow and ice, including the application of ice-melting salt/sand materials. 1. INSPECTION OF THE SITE(s) AND SUBMISSION OF STATEMENT- Before submitting the proposal, the bidder shall visit each site/facility/location within the area(s), examine its conditions, and thoroughly acquaint themselves with all obstacles and advantages of performing the work. 2. The entire sidewalk must be cleared of snow and ice to ensure safe and accessible passage for pedestrians. Partial clearing is not acceptable. Contractors are required to fully address the entire sidewalk area as directed by the Official, Project Manager, or their designee. 3. Work will include clearing snow from sidewalks, walkways, pathways. The vendors selected through this IFB will perform such work whenever necessary as directed by the Official and forecasted weather conditions...