3.3.4.1 Mobilization 1 LS 3.3.4.2 Construction Surveying 1 LS 3.3.4.3 Traffic Control 1 LS 3.3.4.4 Utility Repairs 1 CS $20,000.00 $20,000.00 3.3.4.5 Engineer Directed Work (EDW) 1 CS $40,000.00 $40,000.00 3.3.4.6 Concrete Sidewalk (Permanent) 110 SY 3.3.4.7 Concrete Curb & Gutter (Permanent) 165 LF 3.3.4.8 Concrete Slab Road Replacement 300 SY 3.3.4.9 Traffic Markings & Signs 1 LS 3.3.4.10 Sliplining 14-inch 475 LF 3.3.4.11 14-inch Force Main 18 LF 3.3.4.12 12-inch Force Main 45 LF 3.3.4.13 6-inch Force Main 40 LF 3.3.4.14 10-inch Gravity Sewer 43 LF 3.3.4.15 8-inch Gravity Sewer 38 LF 3.3.4.16 Sewer Cleanout Install 6 EA 3.3.4.17 8-inch CIPP 546 LF 3.3.4.18 Sewer Service CIPP 155 LF 3.3.4.19 Sanitary Sewer Manhole Installation 1 EA 3.3.4.20 Sanitary Sewer Bypass Vault 1 EA 3.3.4.21 Manhole Rehabilitation 6 EA 3.3.4.22 Storm Drainage Pipe 8-inch 30 LF 3.3.4.23 Storm Drainage Pipe 12-inch 50 LF 3.3.4.24 Sanitary Sewer Bypass 1 LS 3.3.4.25 Television Inspection Sewer Main 1684 LF 3.3.4.26 Television Inspection Sewer Lateral 374 LF 3.3.4.27 Annular Space Grout G1 6 CY 3.3.4.28 Pump Station 3 Connection Pipe 1 LS