1. Doors • Objective: Remove and dispose of existing doors and install new doors to ensure proper functionality and security. o 3 ground level storefront, commercial doors on the north side Full light storefront doors o 2 upper level doors on the south side Metal doors with small side light • Tasks: • Remove existing doors if necessary and dispose of properly. • Install new door frames and doors. • Ensure doors are properly aligned and functional. • Install hardware such as locks, handles, and hinges. • Provide the Village of Marcellus with all keys. 2. Windows • Objective: Remove and install window openings to ensure proper insulation and functionality. o 1 East side window o 1 South side upper window o Clean any existing windows to remove graffiti and paint • Tasks: o Remove and dispose of windows and related material completely. Prepare opening to receive new window. Foam, caulk, and/or insulate cavity prior to installation of replacement window. o Furnish and install new double hung, stationary, sliding and awning PVC, thermopane replacement window unit as manufactured by Silverline #8500 or approved equal. Windows to have Low "E"/ Argon gas filled glass. New window to meet all current code requirements. Provide new full snap in screen unit. Recommend northern climate energy star rated windows. 3. Access & Stability • Objective: Create safe access and a stable building • Tasks: o Repair and stabilize lower joists with 2”x10” or greater o Build a supporting wall or system to support joists where necessary to complete other stabilization work 1. Support floor to prevent damage to structure. Furnish and install new beam of adequate size to carry applied loads. Include adequate bearing for new beam including metal support columns and concrete footings as required to properly support beam. Work to be done to ensure proper structural integrity and meet all current code requirements. o Build and Frame in vertical wall above and alongside stairs that access 2nd floor o Install 5/8” OSB or greater over the existing subfloor to create a level surface o Patch subfloor to create a level surface o Build a temporary safety rail for the stairway o Remove existing exterior walkway, landing and stairwell o Build a new, code compliant, safe, structure for 2nd floor egress 1. Remove and dispose of existing landing and steps. Furnish and install new pressure treated wood landing and new closed, raised pressure treated wood steps. Furnish and install new concrete footings , 2 inch x pressure treated wood beams and 6 inch x 6 inch .60 pressure treated support posts. Include new pressure treated floor system, sized per code, with 2 inch x pressure treated floor joists @ 16" oc, appropriate flashing, fasteners and anchors. Include new 5/4 inch x 6 inch pressure treated floor boards, installed using approved deck screws, flat side down with no space between boards. Include new pressure treated wood guardrail system with 2 inch x 2 inch pressure treated square spindles and 4 inch x 4 inch pressure treated wood support newel posts. Include new pressure treated wood closed, raised stair system with 5/4 inch x 6 inch pressure treated floor boards, pressure treated 1 inch x 8 inch (ripped to size) riser boards and pressure treated handrail system with 2 inch x 2 inch pressure treated square spindles and 4 inch x 4 inch pressure treated newel posts. Include 1 inch x 6 inch pressure treated vertical, enclosed landing skirting. All work to be done to ensure proper structural integrity and meet all current code requirements. o Install new D4 vinyl siding on south upper floor 1. Remove and dispose of all damaged siding and trim. Prepare surfaces for new siding and trim installation to match existing as close as possible, including replacing missing, damaged or improperly installed flashing. Furnish and install over existing wall surfaces, 1/2 inch thick Styrofoam Brand Extruded Polystyrene insulating backer board with a minimum R factor of 2.5 at 75 degrees F, as manufactured by Dow Chemical Company or approved equal. Install new siding and trim. Installation to meet all current code requirements and proper technique to meet manufacturers written instructions. o Install gutters (upper south side, middle level south side) and downspouts with drains where necessary for water control to prevent further decay 1. Remove and dispose of existing damaged gutters completely. Furnish and install new 5- inch gutters, 3-inch downspouts, and 36 inch long extensions. Construct gutters and downspouts of 0.027 gauge seamless aluminum. Provide watertight construction fastened securely to structure.