• Grinding existing pavement • Placement of ARHM overlay • Placement of traffic detection loops • Construction of ADA curb ramps • Constructing PCC sidewalk • Residential drive approaches • Curb • Gutter • Ribbon gutter • Placement of CAB and AC base pavement • Removal of existing CMP • Removal of existing junction structure • Removal of existing inlet structure and catch basin • Installation of new transition structure • Placement of 12” RCP • Construction of a curb opening catch basin with local depression • Trenching, excavation, backfill, and trench repair • Utility support Adjusting to Grade: • Utility valve covers • Manhole covers and rings • Monument wells • Other appurtenances as necessary Domestic Water & Sanitary Sewer Improvements: • Removing and/or abandoning-in-place and slurry-filling existing water main • Placement of 12-inch diameter cement mortar-lined and coated steel pipe • Relocation of existing water meters • Installation of new water meter boxes • Trenching, excavation, backfill, and trench repair • Utility support • Placement of valves, fittings, and appurtenances • Placement of domestic water service laterals • Placement of fire hydrant assemblies • Placement of reducer • Placement of air vacuum and air release valve assemblies • Removing and replacing existing 4” VCP sewer laterals Street Lighting Improvements: • Installing new street light poles, foundations, and LED light fixtures • Installation of pull boxes and conduit • Trenching, excavation, backfill, and trench repair • Utility support • Other appurtenances necessary to complete the project as described in the project plans and specifications Other Improvements: • Installing new mailboxes • Relocating existing mailboxes