The selected contractor shall furnish all labor, materials, tools, equipment, and supervision to complete the following work in accordance with professional standards and applicable regulations: • Areas to be Included: • Population Showers (10 total) • Ad-Seg Showers (8 total) • 1AF Shower (1) • Juvenile Shower (1) • Medical Showers (2 total) • Cell Showers (Cells 11, 12, and 13) • Classification Showers (2 total) • Tower 4 A&B Showers (8 total) • General Scope per Shower Area: • Mechanical surface preparation of floors and walls (e.g., diamond grinding or profiling of substrates). • Smoothing or resurfacing of CMU walls and concrete/tile floors. • Application of a waterproof wall coating system with solid color finish. • Installation of a slip-resistant flake floor system, including integral cove bases. • Curb construction or pitch modification to ensure proper drainage where specified. Materials and coatings shall be resistant to cleaning agents, heat, moisture, and heavy foot traffic. Work area temperatures must be maintained at minimum 60°F during installation. Contractor must provide protection of existing conditions and clean up daily.