Complete removal of the existing roof Complete removal and disposal of existing rubber roofing membrane, insulation, flashing, and debris. Inspect decking and report any damage. Roof Deck Preparation Inspect roof substrate for damage or deterioration. Replace any rotted or damaged decking with material of equal or greater quality (unit price required for replacement sq. ft. rate). New Roofing System Installation Install new insulation as required (minimum ½”). Install a fully adhered or mechanically fastened EPDM (Ethylene Propylene Diene Monomer) rubber membrane, minimum thickness 60 mils. All seams shall be heat-welded or bonded per manufacturer instructions. All flashing, penetrations, edges, and parapets must be sealed with compatible flashing materials. Drainage Ensure all roof drains, scuppers, and downspouts are fully functional. Replace or repair any damaged drains and ensure proper slope for drainage.