• Contractor shall provide all labor, materials, tools, and equipment to perform repairs if possible or replacement of defective systems, dependent upon trade: -Defective heating units between 10/1/2025 – 5/1/2026 & 10/1/2026-5/1/2027 -Defective Central AC Units between 6/01/2026 – 9/30/2026 & 06/01/2027-9/30/2027 • The work shall include furnishing and installing all materials needed to make the appropriate repairs/replacement. • All work, materials and manner of placing materials are to be in strict accordance with the Department of Housing Contractor Manual (available upon request) and all local, state, and federal laws and ordinances. • Contractor shall be compensated on a time and material basis, in accordance with the rates set forth in the contract.