The contractor or its subcontractor will be expected to perform the following: • Initial and follow on meetings with city staff to review existing city documents and to schedule exploratory work. • Perform field investigations by physical inspection at approximately fifty (50) water main locations to verify current data, records, and charted locations. • Perform field investigations by physical inspection at approximately twenty-five (25) sewer main locations to verify current data, records, and charted locations. • Through document review and fieldwork verification, identify main materials, estimate approximate ages, identify overall regulatory compliance, and functional condition. • Utilize GPS survey grade equipment and GIS software compatible with the city's current GIS data to include locations of main potholes and all valves and hydrants. Provide X, Y, Z State Grid Coordinates for all data points. Meter locations are not required.