Electrical Upgrade Building 2 Electrical Upgrade Building 2, Overbuild existing 336 line from existing transfer switch to Building 2 and tie into existing drop. Buildout 3 phase 208v with neutral. Electrical Upgrade Building 2 must be a turn-key job including all necessary materials, labor, and equipment. Electrical Upgrade Building 2 materials needed but not limited to those as specified below: 200’ (Feet) – 4/0 Quadraplex Aluminum Service 1800’ (Feet) – ACSR, Aluminum Conductor Steel Reinforced 336.4 AL (Aluminum) LINNET 600 foot – ASCR (4 Aluminum Conductor Steel Reinforced 4/0 AL 18 – Insulator Dead-end/Suspension 3 – 15KV 100A Polymer Cutout 4 – Crossarm, 8 feet 4 – Crossarm Brace, 3-1/2 foot 8 – Carriage Bolt 3/8-inch x 4-1/2 inch 8 – Washer, 3/8 inch 4 – Lag Screws, 4 inches 12 – 15KV Polymer Insulator Pin 10 – Tap-con 3 – Clevis Insulator 3 – Insulator Spool Grey Polymer Wedge Clamp 2/0 – 4/0 ASCR Motor size in Horsepower: 2 15 Horsepower motors for the air handler 1 15 Horsepower motor inside the building 6 ¾ Horsepower motors on the outside fans