Mobilization 1.00 L.S. Clearing and Grubbing 1.00 L.S. Removal of Asphalt Pavement (All Depths) 100.00 Sq. Yd. Removal of Pipe (All Sizes) 40.00 Lin. Ft. Muck Excavation (F.M.) 55.00 Cu. Yd. Borrow Excavation (F.M.E.) (Contractor Furnished) (Class 9) 299.00 Cu. Yd. Structure Excavation 260.00 Cu. Yd. Crushed Stone, (Size 825) 185.00 Ton Hot Mix Asphalt, ST, 9.5 mm 40.00 Ton Hot Mix Asphalt, ST, 19 mm 24.00 Ton Hot Mix Asphalt, ST, 9.5 mm, Trench Widening 10.00 Ton Class “B” Structural Concrete, Minor Structures 0.624 Cu. Yd. 65” x 40” Reinforced Concrete Arch Pipe, Class III 96.00 Lin. Ft. 65” x 40” Reinforced Concrete Arch Pipe, End Section 4.00 Each Roadway Construction Surveying 1.00 L.S. Right-of-Way Markers (Type II) 10.00 Each Maintenance of Traffic 1.00 L.S. Additional Construction Signs 0.00 Sq. Ft. 4” Wide Thermoplastic Edge Stripe (Continuous White) (60 Mil) 0.076 Mile 4” Wide Thermoplastic Traffic Stripe (Continuous Yellow) (90 Mil) 400.00 Lin. Ft.