East Side CIP Project 1 Sanitary Sewer Rehabilitations. The scope of work of the Base Bid includes installation of approximately: 10 LF of open cut point repair of 6” gravity sanitary sewer at one location; 20 LF for 6-inch PVC building connections at one location; 10,452 LF of cured-in-place pipe (CIPP); grouting 121 service connections in cured-in-place pipe; exterior grouting and interior sealing of 390 VF of sewer manholes; grouting and patching 13 sewer manholes; installation of three manhole inflow dishes; building of seven manhole bench and inverts; replacement of one manhole frame and cover; 10,335 LF of post-construction flow isolation. Bid Alternates 1, 2, and 3 include additional quantities of similar work.