1.1 INSTALL ONE TYPE S OR T FOUNDATION EA 975 $ 1,356.90 $1,322,977.50 0.0 1.3 INSTALL ONE TYPE M2-5S FOUNDATION EA 275 $ 2,123.90 $584,072.50 0.0 1.4 INSTALL ONE TYPE M2-3S FOUNDATION EA 5 $ 2,123.90 $10,619.50 0.0 1.5 INSTALL ONE TYPE M2-2S FOUNDATION EA 5 $ 2,123.90 $10,619.50 0.0 1.6 INSTALL ONE TYPE M2-5T FOUNDATION EA 120 $ 2,123.90 $254,868.00 0.0 1.7 INSTALL ONE TYPE M2-3T FOUNDATION EA 5 $ 2,123.90 $10,619.50 0.0 1.8 INSTALL ONE TYPE M2-2T FOUNDATION EA 10 $ 2,315.00 $23,150.00 0.0 1.9 INSTALL ONE TYPE "M" CABINET FOUNDATION EA 4 $ 2,101.60 $8,406.40 0.0 1.10 INSTALL ONE STEEL CYLINDER (32" DIAMETER X 9") EA 4 $ 570.10 $2,280.40 0.0 1.11 INSTALL ONE FOUNDATION TO UNDERGROUND STRUCTURE EA 4 $ 687.00 $2,748.00 0.0 1.12 INSTALL ONE FOUNDATION TO UNDERGROUND STRUCTURE OVER RAILROAD TRACKS EA 4 $ 831.90 $3,327.60 0.0 1.14 INSTALL ONE PRECAST CONCRETE SLAB (MAT) ON EXISTING FOUNDATION EA 4 $ 299.00 $1,196.00 0.0 1.15 PROBE & RESTORE TO EXISTING FIELD CONDITION CF 145 $ 128.20 $18,589.00 0.0 1.16 REWORK ANY FOUNDATION TO TAKE A TYPE "S-1" or "T-1" SERIES POST EA 4 $ 502.80 $2,011.20 0.0 1.17 INSTALL ADDITIONAL CONCRETE CY 4 $ 189.80 $759.20 0.0 1.18 REMOVE ONE TYPE "A","B","S" OR "T" SERIES FOUNDATION EA 42 $ 534.80 $22,461.60 0.0 1.20 REMOVE ONE TYPE "M" SERIES FOUNDATION EA 42 $ 1,069.50 $44,919.00 0.0 1.21 REMOVE ONE TYPE "F-1" FOUNDATION EA 4 $ 534.80 $2,139.20 0.0 1.23 REMOVE ONE STREET LIGHT FOUNDATION EA 200 $ 668.40 $133,680.00 0.0 1.25 REMOVE ANY OTHER TYPE FOUNDATION CF 10 $ 66.90 $669.00 0.0 1.26 REMOVE ONE STEEL CYLINDER (32"DIAMETER X 9") EA 4 $ 100.30 $401.20 0.0 1.27 REMOVE ONE STEEL CYLINDER (32" DIAMETER X 18-1/4") EA 4 $ 133.70 $534.80 0.0 1.29 RAISE OR LOWER EXISTING FOUNDATION TO GRADE EA 10 $ 884.40 $8,844.00 0.0 1.3O FURNISH AND INSTALL A FOUNDATION AS SPECIFIED IN NEW YORK STATE DEPARTMENT OF TRANSPORTATION DRAWING M680-13R2(TRAFFIC SIGNAL POLE FOUNDATIONS). THE SIZE OF THE FOUNDATION WILL BE SPECIFIED BY THE ENGINEER. CF 10 $ 1,634.00 $16,340.00 0.0