SCS is seeking bids for the complete demo and removal of boilers 1 & 2 and complete installation of 2 new boilers. The complete installation will require the following: ● Electrical work to bring power back to the new boilers ● Controls work to be completed to tie back into our BMS system ● Exhaust duct work will need to be adapted to fit new boilers and our current exhaust stack ● Natural gas lines will need to be reworked and plumbed into the new boilers ● The new boilers will require a factory authorized rep to complete and document startup of the new boilers. Special note: the contractor is responsible for verifying that any programs in the BMS system will not violate manufacturer's specifications for boiler operations. The boiler requirements are to meet and/or exceed the specifications of boiler 3 which was replaced 1 year ago. Schoolcraft prefers an identical boiler to what is listed below. However, an alternative boiler may be submitted as an alternate bid ● P-K Thermific ● Serial FY35-23-43378 ● Model N2000-VX2 ● Input rating 2,000,000 BTU/hr ● Output rating 1,680,000 BTU/hr ● Input rating Min 1,333,333 BTU/hr ● Min. relief cap 2060 lbs/hr ● Electrical 120v, 60hz. 1Ph ● Venting Category 1 ● Fuel Natural Gas ● Manifold Pressure Factory set non-adjustable ● Gas Pressure Max/Min. 14.0 inches WC / 4.0 inches WC ● Total amperage 12 amps; Boilers 1 and 2 will be demoed/installed in accordance with all state and local code requirements. The awarded contractor will be responsible to apply for and receive all necessary state permits to complete this project. Boilers 1 and 2 will need to be installed per the manufacturer's specifications. All MIOSHA rules will need to be adhered to and followed on this project at all times