The project includes Phase I Engineering and potentially Phase II Engineering for the construction of various bicycle and pedestrian facilities, streetscape and lighting improvements along the Irving Park Road corridor. The project will provide both off‐street and on‐street bike facilities along Irving Park Road or adjacent side streets throughout the Village limits. Off‐street portions of the path will be alongside Irving Park Road. The off‐street path will be a 10‐foot wide HMA shared‐use path. On‐ street bike facilities will be along localstreets between two connections points at Irving Park Road (see attached detailed location map). The on‐street bike routes will consist of pavement markings (sharrows and/or bike lanes) and signage. Intersection Improvements will occur at Irving Park Road and Park Street. These improvements will include high‐visibility crosswalks, ADA ramps, and new pedestrian signals