A. Contractor will attend EPA Needs Survey training , as necessary and required, if necessary visit public water systems (PWS), prepare survey documents, gather supporting documentation, enter the Needs Survey information into a CADMUS/EPA approved data collection method, convert hard copy documentation to PDF files, prepare reports, and other tasks necessary to assist ADEM with the 2025 Drinking Water Infrastructure Needs Survey. B. Site Visits 1. When necessary (See Section 2.C. regarding survey packet fulfillment requirements), Contractor shall make site visits to each of the water systems, approximately 140, chosen by USEPA and identified by ADEM. The contractor will interview water system personnel, identify qualifying needs, and assemble the supporting documents. 2. Prior to site visit, ADEM will provide to the Contractor: a. A list of water systems that are participating in the Needs Survey. The names, addresses, titles, and phone numbers of the representative of the selected water systems are to be contacted to schedule site visits. b. The 2020 Needs Survey for Alabama results