Preselection of the following equipment is included in Mary's Creek Water Reclamation Facility - Preselection Package 2: 1. Equalization and Peak Flow Storage Basin mixing systems (chopper pumps and mixing nozzles). 2. Coarse screens with associated sluice system and washer/compactors. 3. Grit removal equipment with associated grit washers and pumps. 4. Fine screens with associated screening conveying system. 5. Ultraviolet (UV) disinfection system. 6. Centrifuge dewatering system. The scope of work for each Preselected Equipment Supplier (PES) will include the following: 1. Furnish equipment system as defined in the technical specifications. 2. Provide services during the design phase to develop shop drawings for equipment system and assist the Design Engineer in developing the overall facility design. 3. Coordinate with the General Contractor during construction and startup of the equipment system. 4. Equipment system integration, start-up, and testing services. 5. Other work as prescribed in the specifications.