- Remove and replace the existing synthetic turf “carpet” and infill. - Use environmentally sustainable ("green") infill alternatives. - Match existing field line markings and layout. - Meet NFHS (National Federation of State High School Associations) specifications B. Track Surface - Mill and pave the track to a depth of 2 inches. - Resurface and repaint to match existing layout. C. Stadium Lighting - Replace metal halide lights with energy-efficient LEDs. - Maintain existing layout unless changes are recommended. 5. Engineering Needs - Review existing field subgrade, drainage system, and infrastructure. - Determine if base reconstruction is necessary. - Confirm track milling depth via plan review and condition evaluation. - Assess asphalt base for 20-year lifespan feasibility. - Assess lighting poles and underground infrastructure. - Ensure system longevity of at least 20 years post-retrofit. - Test underground electrical wiring. - Evaluate condition of goalposts, bleachers, fencing, turf groomer, and nearby pavement. - No scoreboard work required (new in 2023).