TWO CUSTOM AIR HANDLERS - HEAT ONLY EXISTING EQUIPMENT: 3005-20OSOAHU03/3005-200S0AHU05 MANUFACTURER: THERMAT MODEL NUMBER: HXT-242-H VENDOR RESPONSIBILITIES: VENDOR TO PROVIDE AND INSTALL 2 NEW AIR HANDLER UNITS (HEAT ONLY, NO COOLING.) *DISCONNECT EXISTING STEAM PIPING AND ANY CONTROL WIRING FROM 2 EXISTING UNITS *LOTO AND DISCONNECT POWER TO TWO EXISTING AHU'S & DEMO BACK NEAREST JUNCTION BOX TO *DEMO EXISTING 2 UNITS AND HAUL OFF-SITE (1 AT A TIME) *DISASSEMBLE 2 NEW AHU'S OFF-SITE AND DELIVER TO JOB SITE *REASSEMBLE 2 NEW AHU'S IN PLACE ON EXISTING STRUCTURES *PROVIDE NEW STEAM PIPING (TO MATCH EXISTING SIZES) FROM THE ISOLATION VALVES AND TIE IN TO THE NEW UNITS *CHECK NEW PIPES FOR LEAKS *INSULATE NEW STEAM PIPE WITH 2" FIBERGLASS INSULATION *PROVIDE LABOR AND MATERIALS TO INSTALL 2 NEW, 3P, 40AMP BREAKERS THE EXISTING PANEL FOR THE NEW AHU'S IN CONDUITS WITH 3 #8-AWG AND ONE #10 AWG GROUND *PROVIDE LABOR AND MATERIALS TO INSTALL 2 NEW 3/4" RIDGID *COPPER WIRE FROM EXISTING PANEL TO THE NEW AHU'S.(1 PER AHU) *PROVIDE MATERIALS TO INSTALL 2 NEW NON-FUSED NEMA 1 COMBINATION MOTOR STARTER/DISCONNECTS FOR THE NEW AHU'S.(1 PER AHU) *REINSULATE EXISTING DUCT WORK INSIDE *PROVIDE START-UP OF NEW EQUIPMENT TDCJ RESPONSIBILITIES: COORDINATE DELIVERY AND SCHEDULING OVERSEE PROJECT EXAMPLES: FOR OPTION# 1-(2) AHU'S: MANUF: THERMAL MODEL# TS-1200 1 QTY MODEL# TS-400 1 QTY FOR OPTION# 2-(2) AHU'S: MANUF: TEMTROL MODEL# ITF-DH24 1 QTY MODEL# ITF-DH8V 1 QTY ITF = INTEGRATED FRAME CONSTRUCTION OFFLOADING: THE VENDOR WILL BE RESPONSIBLE FOR OFFLOADING EQUIPMENT AТ DELIVERY SITE UNLESS A MINIMUM OF THREE DAY ADVANCE NOTICE IS GIVEN.