Project description (include milepoint locations): Due to a recent vehicle fire, a portion of NB I5 exit 252 (Kuebler) was damaged and needs to re replaced. Perform a 2" inlay to replace the damaged area. Limits are approximately 12' wide and 24' long. Work requires the replacement of the arrow legend, the double yellow, and 8" white lines. ANTICIPATED WORK ITEMS (PAY ITEMS); Item Description Est. Qty. Unit; 1 Mobilization 1 LS; 2 Temporary Work Zone Traffic Control, Complete 1 LS; 3 Pollution Control Plan 1 LS; 4 Cold Plane Pavement Removal, 2" Deep 32 SQ YD; 5 Level 3, 1/2" Dense ACP Mixture (PG64-22) 5 TON; 6 Hi-Build Paint, Extruded or Sprayed, Surface 72 FOOT; 7 Pavement Legend, Type AB: Arrows (Narrow) 1 EACH