Pump Replacement: Remove existing pumps and install two new dry-pit submersible pumps, each rated at 1,500 gallons per minute (gpm). ï Strainer Upgrade: Install one new vertical automatic backwashing strainer in the basement with the pumps. ï Electrical Systems: Provide and install new electrical equipment in existing building, including panel boards, variable frequency drives (VFDs), and a transformer. ï HVAC Improvements: Install new exhaust fans, air conditioning for the electrical room, and an air scrubber system to meet specified temperature and ventilation requirements. ï Instrumentation and Controls: Provide, install, and integrate new instrumentation and a new Programmable Logic Controller (PLC) system with the existing Supervisory Control and Data Acquisition (SCADA) system to monitor and control the pump station. ï Piping Systems: Install new piping designed for reclaimed water service.