1 2010-108-A-0 Clearing and Grubbing A 100.00 UNIT 2 2010-108-C-0 Clearing and Grubbing C 1.00 LS 3 2010-108-D-1 Topsoil, On-site 97.00 CY 4 2010-108-D-3 Topsoil, Off-site 196.00 CY 5 2010-108-E-0 Excavation, Class 13 2222.00 CY 6 2010-108-F-0 Below Grade Excavation (Core Out) by TON 760.00 TON 7 2010-108-J-0 Subbase, Special Backfill - Gr 30 (3/4" Dense Base Pile) 216.00 TON 8 2010-108-J-0 Subbase, Modified Subbase - Gr 14 (Modified Subbase Pile) 3120.00 TON 9 2010-108-M-0 Compaction Testing 1.00 LS 0 0 0.00 0 Sub Total 0 Division 3010 - Trench Excavation and Backfill 0.00 0 10 3010-108-B-0 Rock Excavation 60.00 CY 11 3010-108-C-0 Trench Foundation - 3" Breaker Run, (Modified Macadam Pile) 215.00 TON 12 3010-108-D-0 Replacement of Unsuitable Backfill Material, Gr 29, (Porous Backfill Pile) 529.00 TON 13 3010-108-D-0 Replacement of Unsuitable Backfill Material, Gr 32, (Modified Subbase Pile) 3653.00 TON 14 3010-108-F-0 Trench Compaction Testing 1.00 LS 15 3010-108-G-0 Class I, Bedding Material, 1" Commercial Clean Stone 1356.00 TON