The scope of Work contemplated for the abovenamed Project includes, the removal and replacement of damaged and/or deteriorating concrete curb, replacing limited sections of sidewalk, the installation of handicap accessible curb ramps where applicable, the installation and/or repair of existing drainage pipe and inlets, the installation of HDPE pipe along the gutter line to pick up sump pump discharge in certain areas, milling of the existing pavement surface, and the installation of pavement base course or base course repairs as needed as determined by visual inspection of the milled pavement surface and a 2-inch pavement surface course overlay. As well as all other Work of any type or description necessary for contemplation of the Project, whether or not specifically described in these Contract Documents