The Contractor shall: 1. Coordinate a schedule for start-up of various equipment and systems. 2. Notify the Engineer ten working days prior to start-up of each item or station. 3. Make sure wells, equipment, etc. are free of construction debris prior to starting pumps and other equipment. 4. Verify that each piece of equipment or system had been checked for proper lubrication, drive rotation, belt tension, control sequence, blockage, or other conditions which may cause damage. 5. Verify that tests, meter readings, and specified electrical characteristics agree with those required by the equipment or system manufacturer. 6. Verify wiring and support components for equipment are complete and tested. 7. Execute start-up under supervision of responsible Manufacturer’s service technician, Utility representative, Engineer, and contractor’s personnel in accordance with manufacturer’s instructions and in accordance the Technical Specifications 8. Submit a written report from the equipment service technician that all equipment or system had been properly installed and is functioning correctly.