The work to be done consists of furnishing all materials, equipment and labor for the construction of: PART A – С (LRA Funds) The project will consist of patching, overlay with 584 tons of recycled asphalt concrete 9.5 mm Superpave, 708 gallons of bitum tack coat, restriping, traffic control and appurtenances. PART D – I (TSPLOST Funds) The project will consist of patching, overlay with 5,341 tons of recycled asphalt concrete 9.5 mm Superpave, 6,474 gallons of bitum tack coat, restriping, traffic control and appurtenances. PART J -– P (GTIB Funds) The project will consist of patching, overlay with 1,726 tons of recycled asphalt concrete 9.5 mm Superpave, 2,093 gallons of bitum tack coat, restriping, traffic control and appurtenances.