Illini Union (#0023): 1. Replacing existing traction elevators and their components with new components for E1, E2, E5 & E6 Providing new machines, selectors, governors and controllers, new cabs and associated construction, new hoist way doors and hardware, new code required two-way communication system. The project will evaluate existing platforms, slings, counterweight, frames and counterweights to determine if replacement is needed. If required, these components will become part of the project scope. The project will also replace existing pit equipment. Any code-required upgrades to the equipment, including but not limited to, ventilation, fire hats, sump pumps, etc. will also be included in this project. The work will be within the elevator shafts, elevator machine room and other associated spaces. Elevator E7 is currently a public elevator, this project will change this from public use to service elevator. The scope will be limited to removal from the current power source which is combined with Elevators E5 & E6. Work shall address deficiencies in the Americans Disabilities Act (ADA). 2. Elevator Mechanical Room: Exhaust Fan, Air conditioning, ventilation, Fire protection and suppression work and integration, rerouting of water line, all non-compliant code related items. 3. Elevator Shaft: Pit Ladder, Pit lighting, Pit Sump Pump and pit, Rail slipper Guides changed to Roller Guides, Cab, Cab doors and operating components, Cab controls including ADA Push Pad Controls, Call buttons and Car position indicators. Miscellaneous items include Fire protection, suppression and integration, all non-compliant code related items.