The project consists of furnishing all labor, material and equipment required to install approximately 5,000 linear feet of 24-inch water line by open cut with embedment, 100 linear feet of 24-inch water line by open cut with steel encasement pipe and embedment, 750 linear feet of 24-inch water line by other than open cut with steel encasement pipe, eight 24-inch resilient seated gate valves, two 16-inch resilient seated gate valves, five 12-inch resilient seated wedge valves, 350 linear feet of 8-inch PVC sanitary sewer by open cut with embedment, 160 linear feet of 8-inch PVC sanitary sewer by other than open cut with steel encasement pipe, 270 linear feet of 10-inch PVC sanitary sewer by open cut with embedment, 195 linear feet of 10-inch PVC sanitary sewer by other than open cut with steel encasement pipe, nine 4-foot diameter manholes, along with all necessary appurtenances.